Building Our New Deck

Page 2


The front wall of the mid-level deck and the stairs were
installed next.  Note the seating along the wall.


A fountain was installed on the mid-level deck and a box
to match the deck was made for the new tomato plants.


The lower deck flooring and the railing for the stairs was
installed and the corner flooring and railing were stained.


A lattice is installed for the tomatoes


The lower deck seating and flooring were cleaned and
stained and a hand rail was added to the railing.


Except for some finishing touches, the project is now finished.

Our deck and garden look fantastic!


With small pieces of wood left over from the deck project,
Kevin and Lexx built this sturdy seat for the top deck.


Huge thanks goes to Kevin for the beautiful design of the
deck and for all of his time and effort put into the project.


[ Our Adventures ]

[ Larry's Home Page ]