Kevin designed the deck and determined what lumber and other materials he
needed. We then went shopping at Lowe's and bought the lumber and other
supplies needed for the project. Lowe's delivered the lumber the next day.
Kevin started by putting in the support poles and then started building the framework.
Then he added the deck floor boards
The top level is stained and finished
The mid-level was completed next
The boards all had to be sanded and then stained
Photos continue on the Next Page
[ Our Adventures ]